Author | Message |
palino6666
Posts: 282
Location: Slovakia TrenchTown Occupation: Student Age: V$: 15 105 |
#153217 2019-01-24 20:20 |
Hello, my E36 2JZ project is still going on, and now I'm finally a complete engine, except for electricity.My engine got finally a good Greddy turbo, I was also delivered a customized pipe to inetrcooler and air delivery. I also bought a new HKS intercooler and planted it there. My engine got a good Greddy oil cooler and carbon pipe to him.I do not have a complete electrical engine and I start it. In two weeks it could be mat, while the frame is made inside the car.
•Finances: I had-17 448V$ +375V$ - Turbo 850V$ -Pipes to turbo 425V$ -Intercooler 230V$ -Oil cooler 80V$ -Pipe to oil cooler 50V$ Balance of finances 16 188V$ |
|
RP cars:
MK2 2.3 V5 BMW E36 Touring 2JZ BMW E36 sedan 325i BMW E30 sedan 316i BMW E30 Touring 318i VW Passat B5 TDI |