Author Message

palino6666

sk
Posts: 282

Location: Slovakia TrenchTown
Occupation: Student
Age:
V$: 15 105
#153217   2019-01-24 20:20          
Hello, my E36 2JZ project is still going on, and now I'm finally a complete engine, except for electricity.My engine got finally a good Greddy turbo, I was also delivered a customized pipe to inetrcooler and air delivery. I also bought a new HKS intercooler and planted it there. My engine got a good Greddy oil cooler and carbon pipe to him.I do not have a complete electrical engine and I start it. In two weeks it could be mat, while the frame is made inside the car.







•Finances:
I had-17 448V$
+375V$
- Turbo 850V$
-Pipes to turbo 425V$
-Intercooler 230V$
-Oil cooler 80V$
-Pipe to oil cooler 50V$
Balance of finances 16 188V$
RP cars:
MK2 2.3 V5
BMW E36 Touring 2JZ
BMW E36 sedan 325i
BMW E30 sedan 316i
BMW E30 Touring 318i
VW Passat B5 TDI