Author | Message |
Mr.Stance
Posts: 1319
Location: --- Sawamatsukura, Nihonmatsu-shi, Fukushima Prefecture, Japan Occupation: Hashiriya Age: 28 V$: 1645 |
#142026 2018-05-23 18:22 |
I'm workig in the car , I already change the camshafts, cylinder head gasket, in addition to the arp bolts, I am also finishing the installation of the turbo and the exhaust (besides the new intake) and some things more...
Status of all the parts - Oil change and filter: Finished - Turbo kit: in progress , almost finished - Intake: It was not installed yet - Exhaust (from downpipe to tail): in progress - Reprogrammable ecu: It was not installed yet - Fix gear ratios: finished - All belt change: finished - Stage 3 clutch: finished - Arp studs: finished - Metal head gasket 256-85mm: finished - Tomei cams: finished - Radiator: It was not installed yet - Water pump: It was not installed yet - Fuel pressure regulator: It was not installed yet - 850 CC Injectors: It was not installed yet |
|
|