Author Message

Mr.Stance

00
Posts: 1319

Location: --- Sawamatsukura, Nihonmatsu-shi, Fukushima Prefecture, Japan
Occupation: Hashiriya
Age: 28
V$: 1645
#143276   2018-06-22 17:45          
The car is ready , i will make an upload later with the final cost of the floor pan and the frontend

Work done :

- engine bay cut
- Tubular Engine bay fabrication
- New floor pans with tubular structure
- New black paint for avoiding rust

I will make the final cost.

This post was edited by Mr.Stance (2018-06-22 19:18, ago)
This topic is locked, new posts are not allowed.