Author Message

Wypple

ar
Posts: 82

Location: Argentina , The Giant Nose.
Occupation: Student of the verb Study.
Age: 20
V$: NO
#141465   2018-05-05 23:08          

The Block and Internals goes to Rectification.


Today I called my friend again to take the motor to the grinding machine and he has accepted completely (what a good friend xD), so we put the engine in the box of the truck and we took it.


The guy of the grinding machine told me that it can do the verification of the crankshaft, the connecting rods and the pistons, so i accepted (i will pay more money).


And the bodyworker told me he can finish the job in 2 days (amazed, lol), so we can take it to my house wednesday and the engine will be on the car the same day but we take it tuesday.


That is the update of the car, it still needs a lot of work, so it will be a long project.

_________
| My Mods |
¯¯¯¯¯¯¯¯¯
i6 BMW Modifications.
This topic is locked, new posts are not allowed.