Author Message

ShadowTuner

be
Posts: 322

Location: Belgium
Occupation: STB
Age: 36
V$: 45000
#120275   2017-04-20 00:41          
Aight, a week has gone by and i did a few things to the Chevelle.
To start i finished up the bad welding ( cut it out and welded in original parts wich i cutted out of a floor of a wrecked SS on the junkyard ) and did more bondo and primering. Nothing real worthy to make pics of.

Monday = partsday

The suspension came in. For once everything was in the package so i could build a first setup. Now keep in mind, this is a temperary setup because i'll go dragracer ( read: shocks, springs, crossbars etc )


Now i can see you thinking. RIMS AND WILWOODS????? YES is the answer. Did i bought them? NO, i borrow them from a co-worker. ( Dont ask about the collors, i gave the 4 rims that were on SS back to the junkyard. )

Junkyard = partsparadise

As i previously said, i ordered a dashboard on the junkyard, they would call me when a chevelle came in with a good dashboard and my luck is on the high end these days. Not only the dashboard was in very good condition, the entire interiour was in good condition. Since i ordered one, i got the first pick on it.
Came home with a Omni filled up asif it was an 18wheeler :D
Dashboard, doorpannels, floorcarpet, rear pannels, roofliner+vinyl, carpets and so on and on and on.



Tomorrow = Workday

I got to haul my ass back to work tomorrow. That means the works on the Chevelle are slowed down again. Still waiting for engine parts wich will take some time. I'll jump in at the local rollcage builder to see if i can get my hands on a good rollcage.

Burning rubber since i'm not allowed to burn houses



My RP: Click over there -----> Here